66539 hauls 6Z27 11:35 Fairwater Yard – Hackney Yard loaded CWR train past Shaldon Bridge on Sunday 23rd January 2011. This working had started life as 6Y27 07:00 Thingley Junction – Hackney Yard, but the train came off site the wrong way round so was terminated at Fairwater Yard and sent back via Westbury & Bristol as 6Z27 in order to turn the set.
66548 hauls the 6Z28 12:03 Westbury Yard – Hackney Yard along the banks of the River Teign at Bishopsteignton on Friday 21st January 2011